牛宏,汪文峰.基于幂指数的电子装备大修工时对比预测模型[J].装备环境工程,2012,9(4):110-113. NIU Hong,WANG Wen-feng.Prediction Model of Overhaul Man-hour of Electronic Equipment Based on Power-exponent[J].Equipment Environmental Engineering,2012,9(4):110-113. |
基于幂指数的电子装备大修工时对比预测模型 |
Prediction Model of Overhaul Man-hour of Electronic Equipment Based on Power-exponent |
投稿时间:2012-02-12 修订日期:2012-08-15 |
DOI: |
中文关键词: 幂指数 大修 预测模型 |
英文关键词:power-exponent overhaul prediction model |
基金项目: |
|
|
摘要点击次数: |
全文下载次数: |
中文摘要: |
随着新装备大修期的到来, 针对装备大修工时预测难的问题, 根据幂指数理论, 结合电子装备的大修流程, 即拆卸、 全面修复和拼装调试三个阶段, 建立电子装备大修工时幂指数对比预测模型。结合实例, 证明了该模型的合理性和操作性, 满足制定详细大修计划的要求。 |
英文摘要: |
Along with the coming of equipment overhaul period, aimed at the man-hour forecast problem of equipment overhaul, based on power-exponent theory, a prediction model of overhaul man-hour of electronic equipment was build according to overhaul flow of the equipment. The flow was three phases, which were disassembly phase, complete repairing phase, and assembling and debugging phase. The result of examples indicated that the model is rational and maneuverable; it meets the requirements of making detailed overhaul scheming. |