王亚莹,李东芳,高鹏.某海外项目应急机排烟扩散对直升机起降影响分析[J].装备环境工程,2019,16(5):90-95. WANG Ya-ying,LI Dong-fang,HAO Peng.Impacts of Emergency Engine Smoke Diffusion of Some Overseas Projects on Take-off and Landing of Helicopter s[J].Equipment Environmental Engineering,2019,16(5):90-95.
某海外项目应急机排烟扩散对直升机起降影响分析
Impacts of Emergency Engine Smoke Diffusion of Some Overseas Projects on Take-off and Landing of Helicopter s
投稿时间:2018-12-17  修订日期:2019-05-25
DOI:10.7643/ issn.1672-9242.2019.05.017
中文关键词:  直升机  海洋平台  CAP437标准  烟气扩散  温升  湍流
英文关键词:helicopter  offshore-platform  CAP437 standard  exhaust gas diffusion  temperature rise  turbulence
基金项目:
作者单位
王亚莹 海洋石油工程股份有限公司 设计公司,天津 300451 
李东芳 海洋石油工程股份有限公司 设计公司,天津 300451 
高鹏 海洋石油工程股份有限公司 设计公司,天津 300451 
AuthorInstitution
WANG Ya-ying Design Company, Offshore Oil Engineering Co., Ltd., Tianjin 300451, China 
LI Dong-fang Design Company, Offshore Oil Engineering Co., Ltd., Tianjin 300451, China 
HAO Peng Design Company, Offshore Oil Engineering Co., Ltd., Tianjin 300451, China 
摘要点击次数:
全文下载次数:
中文摘要:
      目的 对某海外海洋平台的直升机甲板上空直升机起降存在的风险进行分析。方法 对比分析国内外的标准规范,确定以CAP437为直升机起降的量化衡量指标,在此基础上利用数值模拟软件对影响直升机起降的两个主要因素,温度场和湍流场进行模拟分析。结果 无论是温升,还是湍流强度都不会对直升机的起降造成影响。结论 该海外海洋平台上直升机甲板的不可用概率为0。同时确认此平台柴油应急机的烟气排放,及空调冷凝单元气体排放位置设置合理。
英文摘要:
      Objective To analyze the risk of take-off and landing of helicopters over the helicopter deck of an overseas marine platform. Methods The standards and codes at home and abroad were compared and analyzed to determine CAP437 as the quantitative measurement index for helicopter takeoff and landing. On this basis, CFD software was used to simulate the two main factors affecting helicopter takeoff and landing, temperature field and turbulent flow field. Results Neither the temperature rise nor the turbulence intensity would affect the take-off and landing of the helicopter. Conclusion The probability of unavailability of the helicopter deck on the offshore platform is zero. At the same time, it is confirmed that the discharge position of the exhaust of the diesel emergency engine and the gas discharge position of the air conditioning condensing unit are set properly.
查看全文  查看/发表评论  下载PDF阅读器
关闭

关于我们 | 联系我们 | 投诉建议 | 隐私保护 | 用户协议

您是第12770004位访问者    渝ICP备15012534号-5

版权所有:《装备环境工程》编辑部 2014 All Rights Reserved

邮编:400039     电话:023-68792835    Email: zbhjgc@163.com

视频号 公众号