张习习,方志耕,陶良彦,刘思峰.卫星伸展机构的图示评审技术应用[J].装备环境工程,2019,16(9):88-94. ZHANG Xi-xi,FANG Zhi-geng,TAO Liang-yan,LIU Si-feng.Graphical Evaluation Review Technique of a Satellite Extension Mechanism[J].Equipment Environmental Engineering,2019,16(9):88-94. |
卫星伸展机构的图示评审技术应用 |
Graphical Evaluation Review Technique of a Satellite Extension Mechanism |
投稿时间:2019-03-09 修订日期:2019-04-15 |
DOI:10.7643/issn.1672-9242.2019.09.016 |
中文关键词: 卫星伸展机构,图示评审技术 多元异构 不确定信息 矩阵算法 |
英文关键词:satellite extension mechanism, GERT multiple heterogeneous uncertain information matrix determinant solution |
基金项目:国家自然科学基金(71671091);校研究生创新基地(实验室)开放基金(kfjj20170906) |
|
Author | Institution |
ZHANG Xi-xi | a.College of Economics and Management, b.Grey System Research Institute, Nanjing University Of Aeronautics and Astronautics, Nanjing 211100, China |
FANG Zhi-geng | a.College of Economics and Management, b.Grey System Research Institute, Nanjing University Of Aeronautics and Astronautics, Nanjing 211100, China |
TAO Liang-yan | a.College of Economics and Management, b.Grey System Research Institute, Nanjing University Of Aeronautics and Astronautics, Nanjing 211100, China |
LIU Si-feng | a.College of Economics and Management, b.Grey System Research Institute, Nanjing University Of Aeronautics and Astronautics, Nanjing 211100, China;Computational Intelligence Research Center, De Montfort University, Leicester LE19BH, England |
|
摘要点击次数: |
全文下载次数: |
中文摘要: |
目的 解决卫星伸展机构参数表现形式多样且不确定的问题。方法 运用图示评审技术,构建MU-GERT网络模型,并将参数统一用广义灰数表征。考虑解析算法的复杂性,提出针对该网络模型的矩阵式表征方法,并设计出矩阵式求解算法,便于运用计算机编程进行准确快速的求解。结果 用MU-GERT网络模型计算概率不确定时制作一个合格卫星伸展机构需要的时间,仿真模拟出制作出一个合格卫星伸展机构的期望与机会。结论 为图示评审技术在卫星伸展机构研制中的应用提供了研究思路和经验借鉴。 |
英文摘要: |
Objective To solve the varied and uncertain parameters of satellite extension mechanism. Methods The MU-GERT network model was constructed by the graphical review technique, whose parameters were represented by generalized Grey number. Considering the complexity of analysis algorithm in random network, this paper proposed a matrix determinant solution of MU-GERT network model. The algorithm was designed to solve the problem quickly and accurately by computer. Results The MU-GERT network model was used to calculate the time of making a qualified satellite extension mechanism when the probability was uncertain, to simulate the expectations and opportunities for producing a qualified satellite extension mechanism when the time was uncertain. Conclusion It provides references for the application of graphical evaluation review technique on the development of satellite extension mechanism. |
查看全文 查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|