徐华天,杨威,温玉芬,毕武喜.定向钻穿越管道阴极保护数值模拟评价方法[J].装备环境工程,2020,17(11):31-36. XU Hua-tian,YANG Wei,WEN Yu-fen,BI Wu-xi.Numerical Simulation Method for Cathodic Protection Evaluation of HDD Pipeline[J].Equipment Environmental Engineering,2020,17(11):31-36.
定向钻穿越管道阴极保护数值模拟评价方法
Numerical Simulation Method for Cathodic Protection Evaluation of HDD Pipeline
投稿时间:2020-08-21  修订日期:2020-09-15
DOI:10.7643/issn.1672-9242.2020.11.005
中文关键词:  定向钻管道  阴极保护  数值模拟  CDEGS  土壤电阻率  评价方法
英文关键词:HDD  cathodic protection  numerical simulation  CDEGS  soil resistance  evaluation method
基金项目:中石油管道有限责任公司科技攻关项目(2017B-3415-0507)
作者单位
徐华天 中国石油管道科技研究中心,河北 廊坊 065000 
杨威 中国石油天然气管道工程有限公司,河北 廊坊 065000 
温玉芬 中国石油管道分公司,河北 廊坊 065000 
毕武喜 中国石油管道科技研究中心,河北 廊坊 065000 
AuthorInstitution
XU Hua-tian PetroChina Pipeline R&D Center, Langfang 065000, China 
YANG Wei China Petroleum Pipeline Engineering Corporation, Langfang 065000, China 
WEN Yu-fen PetroChina Pipeline Company, Langfang 065000, China 
BI Wu-xi PetroChina Pipeline R&D Center, Langfang 065000, China 
摘要点击次数:
全文下载次数:
中文摘要:
      目的 通过数值模拟的方法探索定向钻穿越管道的阴极保护评价。方法 根据一条5130 m长度的定向钻穿越管道的实际参数,基于CDEGS软件计算方法,应用涂层耐受电压与电流密度的关系,计算定向钻管道浅埋层和岩石层中的管道的电位分布。结果 通过调整土壤分层电阻率参数及土壤分层厚度进行计算,得到了定向钻穿越管道在分层土壤电阻率条件下的阴极保护电位分布规律。结论 明确了土壤电阻率是影响定向钻管道电位分布的主要因素,形成了基于定向钻管道两端阴极保护电位和土壤分层电阻率,推导了整条定向钻穿越管道的阴极保护电位分布情况的评价方法。
英文摘要:
      The work aims to explore the cathodic protection evaluation of HDD pipeline through numerical simulation. According to the real parameters of a 5130 m HDD pipeline, the cathodic protection potential distribution of the HDD pipeline in the shallow buried layer and rock layer was calculated by the CDEGS software based on the relationship between coating withstand voltage and current density. By adjusting the soil layer resistivity parameters and soil layer thickness, the cathodic protection potential distribution law of HDD pipeline under layer soil resistivity condition was obtained. It is clear that the soil resistivity is the main factor affecting the potential distribution of the HDD pipeline, and an evaluation method for deriving the cathodic protection potential distribution of the entire HDD pipeline based on the cathodic protection potential at both ends of the HDD pipeline and the soil layer resistivity is formed.
查看全文  查看/发表评论  下载PDF阅读器
关闭

关于我们 | 联系我们 | 投诉建议 | 隐私保护 | 用户协议

您是第12772768位访问者    渝ICP备15012534号-5

版权所有:《装备环境工程》编辑部 2014 All Rights Reserved

邮编:400039     电话:023-68792835    Email: zbhjgc@163.com

视频号 公众号