张辰玉,袁猛,刘元海.海洋环境下飞机典型接地柱防腐蚀设计研究[J].装备环境工程,2020,17(12):54-59. ZHANG Chen-yu,YUAN Meng,LIU Yuan-hai.Corrosion Protection Design of Aircraft Ground Column in Marine Environment[J].Equipment Environmental Engineering,2020,17(12):54-59.
海洋环境下飞机典型接地柱防腐蚀设计研究
Corrosion Protection Design of Aircraft Ground Column in Marine Environment
投稿时间:2020-05-14  修订日期:2002-06-10
DOI:10.7643/issn.1672-9242.2020.12.009
中文关键词:  电搭接  接地柱  防腐蚀设计  接触电阻
英文关键词:electrical lap  ground column  corrosion protection design  installation  contact resistance
基金项目:
作者单位
张辰玉 中国特种飞行器研究所 结构腐蚀防护与控制航空科技重点实验室,湖北 荆门 448035 
袁猛 中国特种飞行器研究所 结构腐蚀防护与控制航空科技重点实验室,湖北 荆门 448035 
刘元海 中国特种飞行器研究所 结构腐蚀防护与控制航空科技重点实验室,湖北 荆门 448035 
AuthorInstitution
ZHANG Chen-yu Aviation Key Laboratory of Science and Technology on Structural Corrosion Protection and Control, China Special Vehicle Research institute, Jingmen 448035, China 
YUAN Meng Aviation Key Laboratory of Science and Technology on Structural Corrosion Protection and Control, China Special Vehicle Research institute, Jingmen 448035, China 
LIU Yuan-hai Aviation Key Laboratory of Science and Technology on Structural Corrosion Protection and Control, China Special Vehicle Research institute, Jingmen 448035, China 
摘要点击次数:
全文下载次数:
中文摘要:
      目的 研究海洋环境对典型接地柱防腐蚀安装设计的影响。方法 以×型飞机某半封闭关键部位安装的接地柱为研究对象,设计三种防腐蚀安装方法,并在实验室环境谱下开展加速腐蚀试验,借助宏观、微观检测及接触电阻测试,对不同类型的试验件开展检测与测试。结果 两周期实验室加速试验结束后,采用直接安装模式的接地柱因底座腐蚀而无法检测接触电阻;采用填角安装模式的接地柱外观腐蚀严重,但其内部仍为电接触;采用封包安装模式的接地柱其内部被密封剂保护完好。结论 三种接地柱防腐蚀安装设计方法各有利弊,可根据结构的局部环境特点视情选择。
英文摘要:
      The work aims to study the influence of marine environment on the anti-corrosion installation design of typical ground column. Three kinds of anti-corrosion installation methods were designed by taking the ground column installed in a semi-closed key part of type x aircraft as the research object, and accelerated corrosion tests were carried out under the laboratory environment spectrum. Different types of test pieces were detected and tested by means of macroscopic and microscopic tests and contact resistance tests. At the end of the 2 cycles of accelerated test in the laboratory, the contact resistance of the ground column with the direct installation mode could not be detected due to the corrosion of the ground column base. The ground column with the filling installation mode had a serious corrosion appearance, but its internal electrical contact was still kept. The ground column with the package-mounted mode was well protected internally by sealant. There are advantages and disadvantages of the three methods of ground column installation design, which can be selected according to the local environmental characteristics of the structure.
查看全文  查看/发表评论  下载PDF阅读器
关闭

关于我们 | 联系我们 | 投诉建议 | 隐私保护 | 用户协议

您是第12772678位访问者    渝ICP备15012534号-5

版权所有:《装备环境工程》编辑部 2014 All Rights Reserved

邮编:400039     电话:023-68792835    Email: zbhjgc@163.com

视频号 公众号