|
Study of Wartime Repair Ability Evaluation Method of Maintenance Unit |
Received:May 18, 2012 Revised:October 15, 2012 |
View Full Text View/Add Comment Download reader |
DOI: |
KeyWord:maintenance unite wartime repair ability evaluation |
Author | Institution |
LIU Ping |
1.Ordnance Engineering College, Shijiazhuang , China; 2. Unit 71571 of PLA, Yantai , China |
GAO Qi |
Ordnance Engineering College, Shijiazhuang , China |
HUANG Zhao-xie |
Ordnance Engineering College, Shijiazhuang , China |
GE Yang |
Ordnance Engineering College, Shijiazhuang , China |
|
Hits: |
Download times: |
Abstract: |
Wartime maintenance task demand was analyzed. Mathematic model of maintenance unit wartime repair ability was established for the requirements of the least time and consume. Evaluation was carried out with this model. The method of maintenance unit wartime repair ability evaluation was put forward, which can be argument for commander to schedule maintenance task and improve utilization efficiency of wartime maintenance resource greatly. |
Close |