Prediction Model of Overhaul Man-hour of Electronic Equipment Based on Power-exponent
Received:February 12, 2012  Revised:August 15, 2012
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:power-exponent  overhaul  prediction model
     
AuthorInstitution
NIU Hong Unit 1 of PLA, Jinjiang , China
WANG Wen-feng Unit 94873 of PLA, Fuqing , China
Hits:
Download times:
Abstract:
      Along with the coming of equipment overhaul period, aimed at the man-hour forecast problem of equipment overhaul, based on power-exponent theory, a prediction model of overhaul man-hour of electronic equipment was build according to overhaul flow of the equipment. The flow was three phases, which were disassembly phase, complete repairing phase, and assembling and debugging phase. The result of examples indicated that the model is rational and maneuverable; it meets the requirements of making detailed overhaul scheming.
Close