Research on Alternation Methods of Readiness Reserve Material Based on Storage Life
Received:February 22, 2013  Revised:July 01, 2013
View Full Text  View/Add Comment  Download reader
DOI:10.7643/issn.1672-9242.2013.04.025
KeyWord:readiness reserve material  storage reliability  storage life  particle swarm optimization
           
AuthorInstitution
ZHANG Zuo-gang Qingdao Branch of Naval Academy of Aeronautical Engineering,Qingdao,China
HU Xin-tao Qingdao Branch of Naval Academy of Aeronautical Engineering,Qingdao,China
ZHOU Wei Qingdao Branch of Naval Academy of Aeronautical Engineering,Qingdao,China
LIU Jun-ying Qingdao Branch of Naval Academy of Aeronautical Engineering,Qingdao,China
Hits:
Download times:
Abstract:
      Aiming at the shortage of traditional alternation method in combat readiness reserve material, combining with less failure data of long storage material and unable real-time monitoring, a method of analyzing storage reliability of small sample with periodic testing data was put forward, which was used to estimate storage life for determination of alternation period. Particle swarm optimization was used to overcome the shortages of iterative method, which is long operation time and significant influence of selected initial value on convergence. It was proved that the method can get identical result with engineering practice. The purpose was to provide effective decision support for alternation of readiness reserve material.
Close