Controlling and Ensuring Performance of New Type Equipments with PDCA Mode
Received:November 04, 2016  Revised:May 15, 2017
View Full Text  View/Add Comment  Download reader
DOI:10.7643/ issn.1672-9242.2017.04.020
KeyWord:PDCA  quality control  new equipment
        
AuthorInstitution
WANG Shu-ping Institute of Electrostatic and Electromagnetic Protection, Machine Engineering College, Shijiazhuang, , China
YANG Jie Institute of Electrostatic and Electromagnetic Protection, Machine Engineering College, Shijiazhuang, , China
ZHANG Xi-jun Institute of Electrostatic and Electromagnetic Protection, Machine Engineering College, Shijiazhuang, , China
Hits:
Download times:
Abstract:
      When new equipment is allotted to the troops, there are many problems in controlling and ensuring the performance of the new equipment. In order to solve these problems, the PDCA mode was adopted to manage the quality. Based on analysis of problems of troop control and quality assurance of new equipment as well as causes of these problems, application of PDCA mode in the whole process of controlling and ensuring quality of new equipment in service were expatiated. A complete quality management system might be formed in the troops through the PSCA mode management to make quality management of equipment more well-organized and traceable. The PDCA mode is also applicable to quality management of new equipment in service. Introduction of the management mode might promote continuous improvement of quality management level of new equipment.
Close