Military Aircraft Laboratory Climatic Test Management
Received:January 30, 2018  Revised:April 15, 2018
View Full Text  View/Add Comment  Download reader
DOI:10.7643/ issn.1672-9242.2018.04.013
KeyWord:military aircraft  climatic laboratory  climatic test  test time  test management
        
AuthorInstitution
ZHANG Zhao AVIC Aircraft Strength Research Institute, Xian , China
WU Jing-tao AVIC Aircraft Strength Research Institute, Xian , China
TANG Hu AVIC Aircraft Strength Research Institute, Xian , China
Hits:
Download times:
Abstract:
      Objective To manage upcoming climatic test of military aircraft and provide methods and criteria for the management. Methods The American military aircraft Test and Evaluation (T&E) process and the American military aircraft climatic test plan process were analyzed, and then compared with current situations in China. Results The position and test time of climatic test of American military aircraft laboratory in the equipment test and evaluation system were obtained. The features of American aircraft laboratory climatic test management and ourselves were summarized. Conclusion Shortages and research direction in management of domestic climate test are obtained. It provides references for researching management of domestic climate test.
Close